Hi there, I am designing a new switch stack and wanted to verify a concept with my fellow Meraki enthusiasts.
In their MDF I would place 6 switches.
- 1 x MS225-48FP
- 5 x MS210-48FP
- 5 x MA-CBL-40G-1M (to physically stack the MS225-48FP as the top switch and the other MS210-48FP)
- 1 x MA-CBL-40G-3M (to connect the bottom MS210-48FP stack port to the second stack port on the MS225-48FP.
![ms225&210 stack.JPG ms225&210 stack.JPG](https://community.meraki.com/t5/image/serverpage/image-id/6742i47901FB6E633665E/image-size/large?v=v2&px=999)
![ms225&210 stack-2.JPG.png ms225&210 stack-2.JPG.png](https://community.meraki.com/t5/image/serverpage/image-id/6743i1ADF83E4936657E2/image-dimensions/455x457?v=v2)
-----
David Burgess
CCNP R&S, Security,
CCNA Wireless, MCNA, ECMS1