So, If I created staged upgrade groups with a few switch stacks each, for example Access, Aggregation and Core, then set the upgrade sequence. Would all the switch stacks complete at the same time per staged upgrade group?
Or would each individual switch upgrade one by one within its switch staged group, and each switch stack would be upgraded one by one within the staged upgrade group?
I would hope that each staged upgrade group will apply the upgrade to all switches/stacks within it at the same time. Takes ~20minutes to upgrade all.
Rather than a switch by switch approach within the staged upgrade group. Taking ~20 minute per switch.
Hopefully that makes sense?