We have very tight space in our server rack so it's difficult to remove our switches. They're in the back of the server rack and as you can imagine, so are power strips and wire ducts. In the past, it was not a problem as we could just pull the switch out a bit, remove the rack mount bracket and pull it out the rest of the way.
The brackets on all the Meraki switches don't seem to be removable so now our switches are boxed in. Has anyone else ran into this issue?