I have a pair of existing production switches (MS250s), that we'd like to put into a stack. Unfortunately, I couldn't find any documentation specifically explaining how to do this. Is it as simple as powering down, connecting the stack cables, and then power back on and configure as a stack in the dashboard?
Are there any caveats or things to be aware when trying this?
TIA