Hi all,
never used the staged upgrade so far, only scheduled upgrade in general.
Wondering whats the best way to to it.
Got 2 Corestacks and around 40 access switches.
My plan was to start with access switche (10am) then Core2-stack (10.30am) and Core1-stack (11am)
Is this realistic, using the staged upgrade?
Only got 1,5-2h timeslot to upgrade all.
Or is it better to Upgrade all together, as the swtiches wait until all switches downloaded its firmware / after 20minutes ?
Regards
Marc