Hi all,

never used the staged upgrade so far, only scheduled upgrade in general.

 

Wondering whats the best way to to it.

Got 2 Corestacks and around 40 access switches.

 

My plan was to start with access switche (10am) then Core2-stack (10.30am) and Core1-stack (11am)

Is this realistic, using the staged upgrade?

Only got 1,5-2h timeslot to upgrade all.

 

Or is it better to Upgrade all together, as the swtiches wait until all switches downloaded its firmware / after 20minutes ?

 

Regards

Marc

1 Reply 1
MarcP
Kind of a big deal

as there is enough time, maybe the all together option is the best?

I can schedule it and the firmware should be download before and then upgrade on time.