I am in dire need of assistance. I have limited experience with Catalyst switches, let alone understanding the config/sh run logs. I must move the configuration from the Catalyst switches to the MS425s. Now I realize that for the Meraki switches, some of the configs on the Catalysts don't apply; I need some help interpreting logs. The Catalysts are stacked switches, so I already have the 425s stacked and ready for configuration. The Catalysts have ACLs and static routes configured, I get that. There is a lot of terminology in the putty logs that I am unfamiliar with. I hope to get some help from anyone who knows how to read/interpret them. I am not getting any help from Meraki support or Cisco--Meraki mainly because they can't interpret the sh run logs as well, and Cisco because we don't have a support agreement with them. We are a Non-Profit whose MSP hung us out to dry during this equipment and ISP upgrade process. I have been doing this alone, and I am at the last two sets of stacked switches that are Catalysts (CORE and ISCSI) and one Catalyst that we are using as a DMZ. I am trying to get all our devices into the dashboard so we have visibility and comfort when we move into the next phase of this project, which is the redesign. I have completed about 80% of the project on my own or with minimal help, but this last part is where I am stuck. No one I have been working with thus far can give me a general idea of how to translate the Catalyst configuration into the MS425s. I have compiled much information but still do not understand how to move to the next step. Is there anyone out there willing to take a look? If anyone is interested, I will post the logs. Thanks.