Hi team,
Hoping someone has experience with this scenario.
I have two MS-225 switches that are in production.
I've been tasked with putting these into a stack (physical).
Documentation says to power down switches, remove links, add cables, and power switches back up.
Meraki support states I can plug the stack cables in, and no outage is required...very different response from what the documentation states.
Do I have to power down the MS225's to do this?
How does this change impact the current switch configurations that are running (going from stand alone to stacked) ?