Hi Jackson!
From my own experience, It's better to turn off the Switches as recommended by Meraki and after turning them on, provision their stack.
Even so, if the switches are already in production there may be some bugs or failures of not fully provisioning their stack and having to do the stack procedure more than once to succeed.
With the switches in the staging process, you can do the same as the guide explains without problems with stack provisioning.