Hi There I have a client who will be provided with 3 Stacks of 3 x C9300-48T-M switches. (9 Switches in total). There is a 2 week delay in the devices arriving. So far I have only claimed the devices in the dashboard and assigned to a network. Based on Meraki documentation (Stacking Catalyst (MS390s / C9300-M / C9300X-M) below, it recommends to physically connect the stack with devices powered off, then provide an uplink from one switch to for internet access. https://documentation.meraki.com/MS/Stacking/Switch_Stacks I was wondering what configuration I could pre-stage for instance I want to create SVIs, Routing, DHCP scopes etc, however when attempting to do this the dashboard I need to specify a switch stack, which I is not yet provisioned based on the recommendation I was wondering if it's possible to manually provision stack for these models of switches, which should allow me to preconfigure the network. If anyone has any experience or advice it would be appreciated. Thanks