Looking for a bit of guidance since I have not found any Meraki documents for this specific instance. I am needing to move a stack member from one stack to a newly created stack. In theory it would be, powering down the single switch that is going to be the new stack powering down the existing switch stack removing the stack member plugging the stack member into the single switch bringing everything up going to switch stack overview and checking for detected stacks provisioning this stack Since there isn't an existing member that would be replaced, i would think there is no reason to clone the migrating stack member. There is also no Layer 3 so the stack member is only operating at a layer 2 level. So I guess I am really looking for any gotchas anyone may have experienced if any.