Hey everyone,
I am very new to Meraki products and never held one in my hand till now. While I am planning various roll-outs with Meraki hardware I am here to get assistance in checking if the hardware ordering was correct in terms of powering the new devices.
What's ordered:
- MA-PWR-CORD-EU (Qty: 21)
- MA-PWR-250WAC (Qty: 2)
For:
MS120-8FP: | 1 |
MS210-24P: | 6 |
MS210-48FP: | 10 |
MS410-16: | 2 |
Looking into the data sheets I assume the MS410 will be powered by 250WAC:
250W power supply | MA-PWR-250WAC | MS250-24, MS250-48, MS350-24, MS350-48, MS410, MS425 |
640W power supply | MA-PWR-640WAC | MS250-24P, MS250-48LP, MS350-24P, MS350-48LP |
1025W power supply | MA-PWR-1025WAC | MS250-24P, MS250-48FP, MS350-24X, MS350-48FP |
Is it only possible to check if the PWR-CORD-EU cables are correct to supply the MS210 and MS120 by checking the order or can someone here help me to validate by purely looking into the information I provide?
Fyi: There will be a total of around 90 MR APs powered via PoE via the MS210.
I feel to say sorry to the community for asking such basic question, but I am a big fan of communities (and "The art of community" by Charles Vogl) and took my best effort to bring up my topic the right way. Thanks in advance and sorry for the long post.
Jonathan