MS Stack Member Move

Looking for a bit of guidance since I have not found any Meraki documents for this specific instance.  I am needing to move a stack member from one stack to a newly created stack. 

 

In theory it would be,

  • powering down the single switch that is going to be the new stack
  • powering down the  existing switch stack
  • removing the stack member
  • plugging the stack member into the single switch
  • bringing everything up
  • going to switch stack overview and checking for detected stacks
  • provisioning this stack

 

Since there isn't an existing member that would be replaced, i would think there is no reason to clone the migrating stack member.  There is also no Layer 3 so the stack member is only operating at a layer 2 level. 

 

So I guess I am really looking for any gotchas anyone may have experienced if any. 

1 Reply 1
PhilipDAth
Kind of a big deal
Kind of a big deal

I would add an extra step or two after this one:

  • removing the stack member
  • remove stack member in the Meraki Dashboard
  • factory reset removed stack member

 