Hi, I have been testing Stages Upgrades since I would like to test a new firmware version on one single switch-stack in a network. But I've come to the conclusion that this isn't possible. I have to gradually upgrade every switch in the network. All right, when I considered using that as a workaround. Plan upgrade of the desired switch-stack, and schedule all other switches for later, and then simply cancel the remaining scheduled jobs after the switch-stack has been upgraded. But I can't get rid of the job once it's started. At least that's how it seems. I'm unable to edit or Cancel the scheduled job, so now I'm forced to upgrade all of the switches. - That can't be right! I can cancel all scheduled Meraki jobs, but I can't cancel a Stages Upgrade I have created myself. I can only reschedule or defer. So if I don't want to roll out that particular firmware to all switches in the network, I have a problem! - or am I missing something? Hope my description makes sense! 🙂 Regards Henrik
... View more